PRE-TENSIONING AND POST-TENSIONING IN PRESTRESSED CONCRETE DESIGN
  • PRE-TENSIONING AND POST-TENSIONING IN PRESTRESSED CONCRETE DESIGN
  • PRE-TENSIONING AND POST-TENSIONING IN PRESTRESSED CONCRETE DESIGN
Product Description

Pre-tensioning and Post-tensioning both method are used under pre-stressing processwhich have few edge over the orthodox non-stressed structures like more span to depth ration, higher moment and shear capacity. Generally used PSC Girders , sleepers etc.

Pre-tensioning:

In this method the tendons(group of wires) are pulled between two end bulkhead prior to casting . This pre-stress is later transferred to concrete due to bonding between the concrete and tendons .

Post-tensioning:

In this process first the casting of structure is done and later the tensioning is done. Stressing in Post-Tensioning is done in two-stages in which the order of selection of tendon is done based on the drawing provided.

1st stage- is done after 7 days of casting.

2nd stage- after 28 days of casting.

This tendons are installed via duct pipe in the structure(PSC Girder) which after stressing process are sealed with a mix of cement+water+intraplaster (sika or civax-100). This process is known as Grouting.

Key point: Post-tensioning is preferred over Pre-tensioning method due to its ease and economic constraints.

select from Quora,origin links:https://www.quora.com/What-is-the-difference-between-pretension-and-post-tension-in-structural-members#MoreAnswers


more products about pretension and post tension click below,


If you have any question,feedback or comments,please fill out the form below and we will reply you back as soon as possible
Product  
Name  
Tel  
Email  
Content